Wrotham School Rebuild Diary
April 2025

The superstructure of the halls block (at the front of the site) is now complete (the superstructure being the steel frame and the slab flooring), and swift progress is being made on the teaching block (at the back of the site), just about half of the steel has been erected, and the rest will follow quickly.
We will shortly see the installation of the cladding on the halls block, and it will start to look like a proper building!
Mr Cater and Mrs Abbot took a site visit, and are pictured below having signed the steel which the 6th formers (plus a number of year 10/11) signed before it was installed.
More steel beams will be signed by all the other year groups before they are installed in the teaching block.
2 students have already visited the new school buildings, pictured below as a reward for months of volunteering with the Site Team for her DofE Bronze Award, another visited to take photos of the construction work as part of her A-level photography coursework.