Wrotham School Rebuild Diary

December 2025

Aerial

Progress on the new buildings has been excellent.  Almost all the brickwork is finished on the 3 floor teaching block at the back of the site.  The living roof and solar panels have been are installed on the front building.

Progress is good inside too – wiring, plumbing, ventilation systems all being installed, some classrooms where there are fixed desks are also being installed.

Below is a sneak peak at one of the finished classrooms, this one on the second floor of the teaching block.

Teachers that have seen the rooms have been impressed with the space, and the amount of natural light.

Wrotham School is excited to announce that the design and construction of 7,459 sqm new buildings has started as part of a major renovation project, replacing and upgrading the existing school.